Log In Register

Another Real Answer

The Worst Part About Making the Upgrade Is Getting Rid of the Old Stuff

09/05/2011

1 vote
Text size: - +

With regard to July's problem about networked switches ("Time for a Sensor Network?", July '11, www.ControlDesign.com/real0711): I work as controls engineer for a machine builder/system integrator. The worst part about making the upgrade is getting rid of the old stuff. I’ve performed many upgrades from hardwired I/O to DeviceNet, Ethernet, remote I/O and other protocols. In my experience, the DeviceNet and Ethernet protocols are pretty simple, and have a faster response time. Though it might take maintenance a little while to get the hang of how the networks work, in the end it will definitely save tons of downtime, troubleshooting and wiring headaches.

Chris Wright, Controls Engineer,
Commonwealth Tool & Machine,
www.commonwealthtool.com

1 vote

Read more about

Related Content You May Like If you enjoy this article, our editors think you may enjoy this related reading.

Most Popular Check out the most popular content on ControlDesign.com, as determined by our visitors.

  1. #1Accuracy: Know What You're Getting
  2. #2Essential Safety
  3. #3Is PLC a Dirty Word Now?
  4. #4Wireless Topologies
  5. #5Sensing Without Wires